The activity of electricity transport is governed by Law No. 02-01 of 22 Dhou El Kaada 1422 (corresponding to February 5, 2002) concerning electricity and gas distribution by pipelines and its implementing texts.

The electricity transport network is considered a natural monopoly.
Its management is entrusted to the Société Algérienne de Gestion du Réseau de Transport de l’Électricité (GRTE Spa), which acts as the sole network operator. An authorization to operate the electricity transport network was granted to GRTE by the Ministry of Energy, following the opinion of the Electricity and Gas Regulatory Commission (CREG), in accordance with the decree of April 2, 2007, relating to the authorization to operate the electricity transport network

Remuneration

The remuneration for the transport activity, both for electricity and gas, is determined by the CREG (Electricity and Gas Regulatory Commission) based on a methodology and parameters outlined in Executive Decree No. 05-182.

This remuneration includes,Investment, operation, and maintenance costs of the facilities,Other costs necessary for the activity,A fair return on the capital invested, similar to those applied in comparable activities, and taking into account the development costs.

The remuneration formula includes incentives to reduce costs and improve the quality of supply.

Electricity Transmission Network Usage Tariff

The electricity transmission network usage tariff is defined in Decision D/22-15/CD.

Associated Regulation

Law 02-01 of 22 Dhou El Kaada 1422 (corresponding to February 5, 2002) on Electricity and Gas Distribution through Pipelines

Law 02-01 of 22 Dhou El Kaada 1422 (corresponding to February 5, 2002) governs activities related to electricity and gas distribution through pipelines in Algeria. It establishes the legal framework for the production, transmission, distribution, and commercialization of electricity and gas. The law aims to organize and regulate these sectors to ensure a reliable and high-quality supply while promoting competition and protecting consumer rights. It also sets out the conditions for network connections, the obligations of operators, and the regulatory mechanisms enforced by the competent authorities.

Executive Decree No. 06-430 of 5 Dhou El Kaada 1427 corresponding to November 26, 2006, setting the technical rules for the design, operation, and maintenance of the electricity transmission network

Decree No. 06-430 defines the essential technical standards for the design, operation, and maintenance of electricity transmission networks in Algeria. Its primary objective is to ensure the safety, reliability, and efficiency of these critical infrastructures used to transport electricity over long distances, from production centers to local distribution networks.

Order of 8 Joumada Ethania 1436 corresponding to March 29, 2015, setting the technical regulation relating to the design and construction specifications of electricity transmission facilities

This order, dated 8 Joumada Ethania 1436 (March 29, 2015), establishes the technical regulation regarding the design and construction specifications for electricity transmission infrastructure. It defines the standards and procedures to be followed in the design and building of transmission systems.

Order of Jumada Al-Awwal 27, 1436, corresponding to March 18, 2015, establishing the technical regulations on the technical specifications for the operation of electricity transmission infrastructures

This order, dated Jumada Al-Awwal 27, 1436 (corresponding to March 18, 2015), establishes the technical regulations concerning the technical specifications for the operation of electricity transmission infrastructures. Its objective is to define the standards and technical procedures to be followed to ensure the efficient and safe operation of electricity transmission facilities.

Order of 8 Rabie Ethani 1436 corresponding to January 29, 2015, setting the technical regulation relating to the maintenance specifications of electricity transmission facilities

The order of 8 Rabie Ethani 1436 (January 29, 2015) establishes the technical regulation for maintenance specifications of electricity transmission infrastructure. It defines the standards and procedures to ensure effective maintenance, thereby guaranteeing the safety and reliability of the transmission network.

Order of 14 Rabie El Aouel 1428 corresponding to April 2, 2007, regarding the authorization to operate the electricity transmission network

This order, dated 14 Rabie El Aouel 1428 (April 2, 2007), establishes the conditions and procedures for obtaining authorization to operate the electricity transmission network. It outlines the obligations of operators and the technical and regulatory criteria to be met to ensure safe and efficient network management.

Decision D/01-21/CD of January 3, 2021, approving the 2020–2029 development plan for the electricity transmission network of GRTE

The approval of the electricity transmission network development plan for the period 2020–2029 by the CREG followed the review of documents submitted by GRTE on July 13, 2020, and November 30, 2020.

Decision D/25-18/CD of July 2, 2018, approving the procedure for planning the electricity transmission network

This decision aims to approve, in accordance with the provisions of Law 02-01 of February 5, 2002, related to electricity and the distribution of gas by pipeline, the procedure for planning the electricity transmission network.

Decision D/05-17/CD of November 22, 2017, establishing the procedure for monitoring the quality of service of the electricity transmission network

Regulations have tasked the CREG, through Articles 114 and 115 of Law 02-01, with the general mission of implementing and supervising the public service of electricity and gas distribution by pipeline, and charged it with proposing general and specific standards regarding the quality of supply and customer service, as well as control measures.