Order of 8 Joumada Ethania 1436 corresponding to March 29, 2015, setting the technical regulation relating to the design and construction specifications of electricity transmission facilities

This order, dated 8 Joumada Ethania 1436 (March 29, 2015), establishes the technical regulation regarding the design and construction specifications for electricity transmission infrastructure. It defines the standards and procedures to be followed in the design and building of transmission systems.