This order, dated 8 Joumada Ethania 1436 (March 29, 2015), establishes the technical regulation regarding the design and construction specifications for electricity transmission infrastructure. It defines the standards and procedures to be followed in the design and building of transmission systems.
Order of Jumada Al-Awwal 27, 1436, corresponding to March 18, 2015, establishing the technical regulations on the technical specifications for the operation of electricity transmission infrastructures
This order, dated Jumada Al-Awwal 27, 1436 (corresponding to March 18, 2015), establishes the technical regulations concerning the technical specifications for the operation of electricity transmission infrastructures. Its objective is to define the standards and technical procedures to be followed to ensure the efficient and safe operation of electricity transmission facilities.
Order of Jumada Al-Awwal 20, 1436, corresponding to March 11, 2015, setting the technical specifications and procedures for the design and construction of gas distribution infrastructures
This order, dated Jumada Al-Awwal 20, 1436 (corresponding to March 11, 2015), establishes the technical specifications and procedures for the design and construction of gas distribution infrastructures. Its objective is to ensure the quality, safety, and efficiency of gas distribution facilities.
